Showing posts with label handrail. Show all posts
Showing posts with label handrail. Show all posts

Monday, December 21, 2009

Steakhouse Railing - Commercial

One of the first jobs Danny was asked to do in Scottsville, KY was a handrail for the new steakhouse being built. This is a big deal, considering this was one of 3 sit down restaurants (that are halfway nice) in town! This town doesn't have an Outback, Chili's, Ruby Tuesdays, or anything like that. This is the one and only steakhouse. It turned out really nice!


Sunday, December 20, 2009

Rails on the Square

Danny was asked to create all the railings for the Scottsville, KY square in the Fall of 2008. Here are some pictures of the process.

Here is the square before any rails were created.


Same point of view, with the first round of rails installed.



Here is a shot of the other side of the square:
Here is a before shot of the handicap ramp:Here is the handicap ramp railing installed: This was one of the more complicated rails, because of the radius. Working with the brick masons on the square, he had to make sure that the radius would match their work perfectly. The only set back to this job was having to wait for so many deadlines from the construction crew. It ended up taking about 3 months to complete, but what a beauty it was in the end. All in all, it was a very challenging yet rewarding job.


Montana Railings

Here are some rails Danny made in Helena, Montana while working for Artisan Iron Works. (July 2007)

Saturday, December 19, 2009

Elegant Yet Simple House Railing

Danny designed and fabricated this railing several months ago. Here are a few photos:









Wednesday, December 9, 2009

400 ft of River Rail

Danny's most recent project was building 400 ft. of handrail for a house on the Barren River. The customer did not want the railing made out of 1" tubing, rather 1 1/2" x 1/4" flat bar. Because of the many curves in the rail, this was complicated! If it were made out of tubing, it would have been easier to bend (using a tubing bender). Instead, Danny had to rig up a way to bend the flat bar. He didn't let this keep him from accomplishing the job just the way the customer wanted. Danny welded pieces of metal onto his welding table that helped him heat up and bend the flat bar to the exact measurements that were laid out for him.

Fabricating 9' of railing at a time (4 railings a week), he was able to finish the job in about 3 1/2 months. This fit very well into the customer's time frame! Here are some pictures:



The customer picked this simple design to best suit their needs.

Below are pictures of the stairs leading down into the backyard from the drive. As of January, the customer is still deciding on what kind of design they want for this particular rail. I thought I should upload the before pictures so we can see how much more beautiful the stairs are after the rail is completed.

**note that some pictures were taken and added after this blog's original date, due to a wait on powder coating and other details.