Danny was asked to create all the railings for the Scottsville, KY square in the Fall of 2008. Here are some pictures of the process.
Here is the square before any rails were created.
Same point of view, with the first round of rails installed.
Here is a shot of the other side of the square:
Here is a before shot of the handicap ramp:Here is the handicap ramp railing installed: This was one of the more complicated rails, because of the radius. Working with the brick masons on the square, he had to make sure that the radius would match their work perfectly. The only set back to this job was having to wait for so many deadlines from the construction crew. It ended up taking about 3 months to complete, but what a beauty it was in the end. All in all, it was a very challenging yet rewarding job.